IMPORTANT UPDATE: The major patch 18.8.6.0 for P6 EPPM is now available.  The following list of patches have been added for Primavera

WEB

  • 29330079 DOWNLOADED RESOURCE ASSIGNMENT SPREADSHEET NOT SHOW ALL TIME INETRVALS
  • 29040854 XML IMPORT STATES XML IS NOT A VALID FILE
  • 29336188 COULD NOT FIND STORED PROCEDURE 'PX_RSRCRLASGNMNT_DEL_ROLLED' WHEN JOB TYPE: PROJECT ARBITER (JT_PROJECTARBITER) ENABLED ON MSSQL DATABASE
  • 29319176 EXCEL EXPORT FROM ASSIGNMENTS VIEW (PROJECT AND RESOURCE VIEWS) RETURNS ERRORS
  • 29298699 ERROR: PLEASE ENTER A VALID NUMBER WHEN TRYING TO USE NEGATIVE INTEGER AS REPORT PARAMETER
  • 29285705 WAS THE EXPORT CLASSIC VIEWS IN RESOURCES>ASSIGNMENTS REMOVED INTENTIONALLY?
  • 29272444 FP BUG-BUG 28666114 - SHOW USAGE (FROM ACTIVITIES > ASSIGNMENTS WHEN ADDING/MODIFYING RESOURCE) ONLY SHOWS 1 YEAR SPREAD
  • 29238996 FP RESOURCES ALLOWED TO UPDATE TIME SHEETS AGAINST ACTIVITIES THEY ARE NOT ASSIGNED TOO
  • 29205394 XML IMPORT HAS A COMPLETELY DIFFERENT AND DUPLICATED UDF VALUES ASSIGNED TO EACH ACTIVITY
  • 29190722 ADD BUTTON DISABLED AFTER PASTING TEXT IN TIMESHEET NOTE
  • 29144207 THE DROPDOWN LIST OF THE ACTIVITIES,EPS,RES ASSIGN. VIEWS CAN NOT KEEP THE MOST RECENT VISITED VIEWS.
  • 29041037 WHEN ADJUSTING THE RISK THRESHOLD LEVELS FROM LOWEST TO HIGHEST, THE LOWER VALUES RESET WHEN A HIGHER VALUE IS ADJUSTED

P6 CLIENT

  • 29323814 EPS RELATED ACTIVITY CODES ARE NOT IMPORTED THROUGH XML AFTER UPGRADE TO 18.8.5.0
  • 29250010 RUSSIAN LANGUAGE TRANSLATION ERROR IN P6, PAGE SETUP, MARGINS
  • 28940899 UNITS&PRICES FOR RESOURCES NOT IMPORTED FROM MSP XML TO P6 PRO WITH SQLITE
  • 28716511 RECEIVING PROJECT WAS DELETED BY ANOTHER USER WHEN ATTEMPTING TO COPY/PASTE
  • 29330561 INCREASE SESSION-TIMEOUT IN P6PROCLOUDCONNECT.WAR TO 60 OR 120 MINUTES
  • 29243072 IMPORTING FROM MSP XML TO PRIMAVERA P6 18.8.X WITH WRONG LAG VALUES
  • 29229079 RESOURCE ASSIGNMENTS FILTER ERROR WITH PRICE/UNIT AND MATERIAL RESOURCE
  • 29192130 VISUALIZER WILL NOT DISPLAY VARIANCE - BL PROJECT DURATION
  • 29026217 EXPECTED FINISH OPTION DOES NOT SHOW/CAN'T BE CHANGED IN COLUMN
  • 28945422 IMPROVE PERFORMANCE FOR DELETING RESOURCES AND UDFS
  • 28935752 YOU ARE NOT AUTHORIZED TO USE THE APPLICATION USING TURKISH FORMAT
  • 28923299 UNABLE TO CONNECT TO THE DATABASE USING TURKISH FORMAT
  • 28866550 FP BUG-BUG 28497908 - THE IMPORT TO FIELD SHOWS BLANK OR INCORRECT WHEN CHECKING IN PROJECTS
  • 28865159 IMPORTING BIG XER TO PROFESSIONAL THROUGH PROCLOUDCONNECT WITH CLIENT CACHE ENABLED GETS STUCK
  • 28854663 P6 PRO CLIENT HANGS CREATING APPLY ACTUALS JOB
    28733113 LEVELING OPTION OF 'CONSIDER ASSIGNMENTS IN OTHER PROJECTS WITH PRIORITY EQUAL/HIGHER THAN' BOX IS TICKED ACTIVITY DATES MOVE WHEN SCHEDULED
  • 28683069 UNABLE TO OPEN THE XML FORMAT FILE EXPORTED FROM P6
  • 28941689 MULTIPLIED LAG AFTER IMPORTING XML FILE FROM MSP TO P6
  • 28896135 DATABASE CONFIGURATION FAILING TO WRITE HOST, PORT, SERVICE TO PRMBOOTSTRAPV2.XML VENUS TAGS

 Team Member

  • 29234150 USERNAME WITH Ü IN THE NAME CAUSES AUTHENTICATION FAILURE

INTG

  • 28932860 ESTIMATEDWEIGHT METHODS DO NOT EXIST AT THE WBS LEVEL
  • 29026170 ERROR: ONLY ONE DRIVING PROJECT IS PREMISSIBLE PER FILE. IMPORTING XML PROJECT USING P6 INTEGRATION API