Skip to main content

Oracle Primavera Patch 16.2.5 Released

For those running Oracle Primavera P6 EPPM 16.2 (on premise) there is a new patch available.

Please note, there are two different versions of Primavera P6 EPPM currently available depending on whether you are running Primavera P6 on premise or in the cloud. The latest Primavera cloud version is 17.


WEB

25398001

SEARCH FEATURE NOT WORKING - SET TIMESHEET APPROVAL MANAGER FOR A RESOURCE

25495160

COPY/PASTED PROJECTS NOT APPEARING IN WEB/PRO FOR ALL USERS

25501916

PROJECT PUBLISHINGPROJECT ARBITER JOBS GETTING HUNG INTERMITTENTLY

25501926

WHEN CREATING A BASELINE THE DESCRIPTION DISAPPEARS.

25516607

PRE-MIGRATION 16.1.5: GATEWAY TIMEOUT WHEN ADDING PROJECT

22750847

TIMESTAMP PUBLISHED INCORRECTLY FOR SUMACTUALFINISHDATE IN P6WBS VIEW

22978201

ADDITIONAL INDEXES FOR P6 EPPM SCHEMA

24711898

P6 WEB OUT OF SEQUENCE PROGRESS BAR FILL AT THE END OF THE CURRENT BAR

25177940

DELETED PROJECTS ARE NOT AUTOMATICALLY REMOVED FROM SCHEDULED JOBS

25364270

P6 FAILS TO ADD GATEWAY INTEGRATION PARAMETERS WITH CUSTOMERRORRESPONSEEXCEPTION

25364931

RESOURCE ANALYSIS PAGE IS VIEWED IN CLASSIC OR JAVA APPLET MODE.

25366537

SQL PROJECT STATUS REPORT NOT RUNNING FROM P6

25369079

LIMIT LINE DOES NOT SHOW WHEN GROUPING BY SOME FIELD IN RESOURCE ANALYSIS PAGE

25385871

FILTERING ON ACTIVITY ID WITH BRACKETS DOES NOT FUNCTION PROPERLY.

25386025

END USER HAS ABILITY TO DELETE EPS AND DOES NOT HAVE THE PRIVILEGE.

25410535

PROJECT NOTEBOOKS DIALOG BOX DOES NOT DISPLAY COMPLETELY

25422844

DIFFERENT LANGUAGES APPEARING IN USER ACCESS

25446967

GANTT CHART BAR WITH TYPE "PERCENT COMPLETE" DOES NOT SHOW AS CONFIGURED

25454876

ERROR CREATING RISK THRESHOLDS: FAILED SAVING DATA! ERRORS LOCATED: COLOR

25456183

CANNOT SHOW BASELINE BARS FOR PROJECT GANTT CHART PORTLET IN THE DASHBOARD

25462552

RESTRICTED EPS SCENARIO THROWS EXCEPTION IN P6

25471016

ACTIVITY CODES - PROJECTS IS NOT LOADING

25594613

ACTIVITY SHEETS SYNC FROM P6 TO UNIFIER IS NOT WORKING

25478225

JUNK CHARACTERS IN DESCRIPTION WHEN THE DOC IS CREATED ON CLIENT & VIEWED ON WEB

25483988

VIEW OF PROJECTS CHANGE WHEN SWITCHING FROM CLASSIC TO STANDARD VIEW

25491241

RESOURCE ANALYSIS ADDS OVERALLOCATED UNITS ON TOP OF TOTAL ALLOCATED IN GRAPH

TM

25494905

USER ACCESS IS NOT FILLED DOWN CORRECTLY

25415736

PAST PERIOD TIMESHEETS NOT VISIBLE IN TIMESHEET APPROVAL

25426231

TEAM MEMBER DOES NOT BRING ACTIVITIES ASSIGNED TO THE USER

25471875

P6 TEAM MEMBER MY TASKS NOT POPULATING WITH OWNER ASSIGNED ACTIVITIES.

25408735

HIERARCHY CODE VALUES MISSING IN TEAM MEMBER

25515693

"YOU ARE NOT AUTHORIZED TO PERFORM ACTION" SAVING STEPS IN TM

25501919

CANNOT ASSIGN RESOURCE TO TASK IN TEAM MEMBER TO SPECIFIC TASKS

25501909

TEAM MEMBER ALLOWS NATIVE LOGIN USING /P6TMWEB/LOGIN.JSP WHEN SET FOR SSO

22858343

LOGIN TO EPPM VIA CLOUD TAKING OVER 1 MIN TO LOAD

API

25495158

COULD NOT UPDATE REMAINING-LABOR UNITS THROUGH API

ADMIN

25501922

EST_WT COLUMN IS NULL WHEN IMPORTING FROM XLS

25495157

MANGLER SCRIPT - STRING OR BINARY DATA WOULD BE TRUNCATED

WS

25504179

UPDATE FAILED BECAUSE RELATED INSTANCE(S) HAS BEEN DELETED UPDATING OWNER

25495156

THE INABILITY TO LIMIT CONCURRENT RUNS OF ASAP IMPORT/EXPORT JOBS

25480642

COPY/PASTE WITH BASELINE RESULTS IN TX AND HW - ROW LOCK CONTENTIONS

25501910

GSS LAST RUN TIME DOES NOT UPDATE WHEN RUN MANUAL CONFIGURED WITH P6SERVCES.JAR

P6 PRO

25607865

ERROR WITH CODE "RAIIS-3224-4" OCCURS WHEN LEVELING RESUORCES

25588709

PROJECT LAYOUTS DO NOT COPY WHEN THE PROJECT IS COPIED IN EPPM CLIENT

25586588

SLOW PERFORMANCE: ADD TASK OR SETTING RELATIONSHIP BETWEEN TASK

25551923

A USER CAN SEE HIS PROJECTS IN THE WEB, BUT NOT IN PRO CLIENT

25522416

DELETE_SESSION_ID AS NULL IN USESSION TABLE

25522415

"DO NOT IMPORT" EXTERNAL RELATIONSHIPS BEHAVIOR NOT CONSISTENT

25522414

EVENT CODE EEQEM-3477-4 WHEN TRYING TO MOVE EPS NODES

25522413

RESOURCE WITH LARGE DATA IN RESOURCE NOTES CANNOT BE EXPORTED VIA EXCEL FORMAT

25522411

IN SQLITE DB SECURE CODES ARE NOT BEING RESTORED WHILE RESTORING A BASELINE

25522410

UNABLE TO CUSTOMIZE LOG LOCATION FOR EXPORT/IMPORT

25522407

PROJECT LAYOUTS FOR PROJECTS NOT OPENED ARE DISPLAYING IN THE OPEN LAYOUT WINDOW

25501921

EXPORTING PROJECTS TO MS-PROJECT XML CREATES ILLEGAL CHARACTERS

25501918

STAFF ROLE AND RESOURCE ASSIGNMENT IS BLOCKED (RESOURCE EXISTS, ROLE DOES NOT)

25463163

ERROR DURING OPENING A PROJECT "TCVIRTUALDBENGINE.REFRESHROWSBYKEY..."

25437195

UPDATE BASELINE ERROR: SEVERE FIELD "TEXT" IN UDFVALUE MAY NOT BE SET TO NULL

25424696

LINK ACTIVITIES DISABLE WHEN ASSIGN PREDECESSOR/SUCCESSOR ARE ENABLED

25394882

WHEN ASSIGN RECEPIENT TO P6 ISSUE, GET AVAA0 ERROR.

25376843

ACTIVITY COLUMN "ROLES" SHOWS WITH LOOSE LOGIC IN P6 PRO

25359705

USERDEFINEDFIELDVALUE UNIQUE CONSTRAINT ERROR WHEN UPDATING BASELINE

25359614

RESOURCES ADDED MULTIPLE TIMES TO ACTIVITY NOT DISPLAYED AFTER UPDATE BASELINE

25348200

VISUALIZER PERFORMANCE DUE TO LARGE AMOUNT OF EPS LEVEL ACTIVITY CODE VALUES

25245072

ACTIVITY ID NOT EXPORTED TO MS XML USING SQLITE

25042847

XER FILE IMPORT HANGS ON SAVING CHANGES

24713685

AFTER PROJECT IS PASTED, MUST BE OPENED TO SEE NOTEBOOKS - EPPMDB

25045334

UNABLE TO DELETE PROJECT CAUSE BY FILTER IN VISUALIZER PROJECT LEVEL LAYOUT

25211505

XML IMPORT FAILS WHEN DATA WITH FINANCIAL PERIODS IS IN XML

25214168

UNABLE TO DELETE PROJECT OR IMPORT PROJECT WHEN AUDING ENABLED ON TASKPRED

25248544

P6 PPM CLIENT SUMMARY DATA DOES NOT INCLUDE NEGATIVE COSTS

  • Last updated on .