Skip to main content

Emerald Associates News

P6-Loader v13 - New Release

P6-Loader v13 - New Release

Easier Hierarchies and Fragnet Templating

Read more

P6-QA v8 - New Release

P6-QA v8 - New Release

Your P6-QA metrics are now available in Power BI reports. You can also create custom reports via our P6-Reporter tool in your corporate dashboards. These reports include time based metrics to help you see where in your project these quality issues exist.

Read more

P6-Calculator v7 - New Release

P6-Calculator v7 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Safran Risk v22.2.0 - New Release

Safran Risk v22.2.0 - New Release

Safran Risk has released v22.2.0. Read about all the exciting new features.

Read more

P6-Auditor v5 - New Release

P6-Auditor v5 - New Release

Our latest version of P6-Auditor has a new look and feel making auditing definitions easier and faster to build.

Read more

Safran Risk v22.1.0 - New Release

Safran Risk v22.1.0 - New Release

Safran Risk has released v22.1.0. Read about all the exciting new features.

Read more

P6-Scrubber v6 - New Release

P6-Scrubber v6 - New Release

In version 6, we added notebook type scrubbing and also made improvements to the P6-Scrubber user interface, reports and functionality in general.

Read more

P6-Calculator v6.4 - New Release

P6-Calculator v6.4 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Upcoming Online Training

Upcoming Online Training

Join one of our upcoming, live online training courses for Primavera P6 or Safran Risk.
  • Primavera P6 Basic - July 22-26
  • Primavera P6 Advanced - August 12-14
  • Managing Risk in Safran Risk - August 12-15
  • Primavera P6 Basic - Sept 9-13

Read more

P6-Scrubber v5 - New Release

P6-Scrubber v5 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 5 makes scrubbing files even easier for schedulers.

Read more

P6-Loader v12 - New Release

P6-Loader v12 - New Release

Our latest version of the P6-Loader brings the ability to automate the backups out of P6 even from the Oracle P6 Cloud.

Read more

PCM-Archiver v6.3 - New Release

PCM-Archiver v6.3 - New Release

PCM-Archiver version 6.3 adds support for Primavera Expedition.

Read more

P6-Reporter v3 - New Release

P6-Reporter v3 - New Release

More charts. More insight. Understand your projects in ready to use, customizable reports in Power BI, Tableau or ODV.

Read more

PCM-Archiver v6.1 - New Release

PCM-Archiver v6.1 - New Release

PCM-Archiver version 6.1 gives you better control than ever over the archived file and folder names.

Read more

Safran Risk v21 - New Release

Safran Risk v21 - New Release

Safran Risk has released v21. Read about all the exciting new features.

Read more

P6-Scrubber v4 - New Release

P6-Scrubber v4 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 4 makes scrubbing files even easier for schedulers.

Read more

PCM-Archiver v6 - New Release

PCM-Archiver v6 - New Release

PCM-Archiver version 6 allows you to save even more time when resuming previously-interrupted extractions.

Read more

P6-QA v7 - New Release

P6-QA v7 - New Release

Our latest version of P6-QA brings specific highlights to the GOA and Naval Air Scheduling quality standard metrics.

Read more

PCM-Archiver v5 - New Release

PCM-Archiver v5 - New Release

Our latest version of PCM-Archiver makes it easier than ever before to extract projects from PCM.

Read more

P6-Loader v11 - New Release

P6-Loader v11 - New Release

Our latest version of the P6-Loader brings a new user-interface with the ability to save extract definition and new version 20 support, as well as UDF merging.

Read more

Oracle Primavera P6 19.12.1.0 Released

IMPORTANT UPDATE: The major patch 19.12.1.0 for P6 EPPM is now available. The following list of patches have been added for Primavera

P6 CLIENT

  • 30677830 P6 PROFESSIONAL SQLITE LOGIN PROCESS HANGS AT 11% RESULTING IN POOR LOGIN PERFORMANCE
  • 30675609 ASCENDING OPTION IS AUTO SELECTED BY DEFAULT WHEN USER IS TRYING TO EDIT THE HIERARCHICAL ORDER OPTION IN LEVEL RESOURCES DIALOG
  • 30172859 SAVE FILE WINDOW CAN LOAD BEHIND JOB STATUS WINDOW
  • 30105652 SLOW PERFORMANCE OF CHECKING IN PROJECT FROM SQLITE TO CLOUD THROUGH PROCLOUDCONNECT
  • 30708074 BP-REPLACE REFLECTION PROJECT ERROR ...EXPECTS PARAMETER '@PSERVICE_ID', WHICH WAS NOT SUPPLIED
  • 30675891 EXTERNAL TOOL OPTION DOES NOT RESPECT ENABLEIFNOPROJECTS
  • 30666713 P6 EPPM XML IMPORT UPDATE EXISTING ERROR - MATERIAL RESOURCES CANNOT HAVE TIMESHEETS
  • 30627150 FOOTERS ARE CORRUPTED AFTER UPGRADE
  • 30623433 EXPORT TO EXCEL NOT CAPTURING ALL FIELDS IN TEMPLATE
  • 30600668 PRO CLIENT CUSTOMIZED HEADER FIELDS SHOWING A PLUS SIGN '+' INSTEAD OF THE SPACE THAT WAS USED BEFORE UPGRADE
  • 30571909 THE SINGIN WEB SCREEN IS NOT FULLY DISPLAYED FOR LOGGING IN PROFESSIONAL CONFIGURED WITH SAML AUTHENTICATION
  • 30364822 VISUALIZER LAYOUT DISPLAYS NO GROUP BAND, NOT OBEYING FILTER
  • 30675441 P6 CRASHES WHEN CLICK BROWSE BUTTON IN 'APPLICATION USER LOGIN NAME'
  • 30675837 UNABLE TO IMPORT RESOURCE INTO P6
  • 30204716 WBS DELETION TAKES LONG TIME

WEB

  • 30689603 FULL USERNAME NOT DISPLAYED IN P6 WEB
  • 30701007 FP- USER LOGIN REPORT ONLY RETURNING 5 DAYS OF DATA
  • 30673059 THE SCHEDULED REPORT IS STUCK IN PENDING STATUS
  • 30665649 FP BUG 30505655 - TIMESHEET APPROVALS IS MISSING THE DAILY REPORTED HOURS
  • 30663090 ERROR: THE APPLIED VIEW <NAME> CANNOT BE LOADED. SELECT A DIFFERENT DEFAULT VIEW FOR THIS PAGE IN MY PREFERENCES
  • 30639904 FP- PORTFOLIO FILTERS MISSING BUILT-IN P6 FILTER CRITERIA AFTER UPGRADE TO V18.8
  • 30620422 IMPORT TEMPLATE - IMPORTRESOURCEUNDER IS NOT POPULATED WITH THE MODIFIED RESOURCE-NAME
  • 30662441 JAVA.LANG.NUMBERFORMATEXCEPTION: EMPTY STRING IMPORTING PROJECT XML.
  • 30615482 FP-EMAIL IS PROMPTED WHEN USER TRIES TO DOUBLE CLICK ON ASSIGNED RESOURCE FIELD AND FOCUS OUT IN ACTIVITIES PAGE
  • 30405262 FP BUG-BUG 30376008 - P6 WEB FREEZES WHEN SELECTING TIME APPROVAL
  • e30600140 USER INACTIVITY REPORT INCORRECTLY DISPLAYS USERS WHO HAVE CONNECTED WITHIN THE TIME PERIOD SPECIFIC FROM THE REPORT'S INPUT PARAMETER

TEAM MEMBER

  • 30695097 ERROR YOU ARE NOT AUTHORIZED TO PERFORM ACTION LOADING REST CALL /P6TMWEB/REST/TEAMMEMBER/TASK/ASSIGNMENTS/###
  • 30632816 FP- ACTIVITY START AND END DATES SHOWN AS TODAY'S DATE.
  • 30628253 GENERATE REPORT' IN TEAM MEMBER USING THE GOOGLE CHROME BROWSER DOESN'T ALLOW SAVING AS .HTML

SRVS

  • 30645003 FP BUG 30352258 - PREFIX 'UTF-8' IS INSERTED TO THE NOTEBOOK TOPIC DESCRIPTION USING WS

N/A

  • 29924623 FIELDS TRUNCATED TO 11 CHARACTERS WHEN EXPORTING RELATIONSHIPS TO EXCEL
  • 29817592 THE USER PREFERENCES USED TO CREATE THIS EXCEL FILE COULD NOT BE FOUND...
  • 29717372 IMPORTING .PLF FILES LOSES ASSIGNED UDF COMPONENTS
  • 29675469 OPTIMIZE HEIGHT BY ROW CONTENT INCORRECTLY APPLYS TO ALL RECORDS TO WRAP TEXT INCLUDING THOSE NOT REQUIRED
  • 29585390 YOUR PASSWORD IS INCORRECT. PLEASE TRY AGAIN. WHEN ATTEMPTING TO CREATE A NEW PASSWORD VIA P6 PROFESSIONAL SQLITE
  • 30005790 LOGIN FAILS WITH: INVALID USER NAME AND/OR PASSWORD WHEN USING LDAP AND PASSWORD CONTAINS ??
  • 29938852 CANNOT DOWNLOAD XML FROM JOB STATUS IF PROJECT NAME CONTAINS FORWARD SLASH ('/')
  • 29924183 THE GLOBAL TIMESHEET SETTING ALLOW RESOURCES TO ASSIGN THEMSELVES TO ACTIVITIES BY DEFAULT DOES NOT APPLY TO THE PROJECT PREFERENCES SETTING TEAM MEMBERS CAN ASSIGN THEMSELVES TO ACTIVITIES WHEN THE PROJECT IS CREATED IN PROFESSIONAL
  • 29924104 ACTUAL UNIT ENTRIES ARE NOT SET BACK TO ZERO FOR ACTIVITIES SET TO NOT STARTED
  • 29923650 UNABLE TO DOWNLOAD XML FILE WHEN A LARGE EXPORT HAS COMPLETED IN P6
  • 29919856 TCVIRTUALTABLE.REFRESHAPPEND: TASKRSRC: STREAM READ
  • 29919647 IMPORTING A XML THAT CONTAINS PROJECT ID CONTAINING SPECIAL CHARACTERS DO NOT DISPLAY IN IMPORT OPTIONS
  • 29909803 CALCULATED ROLE LIMIT LINE SHOWING ALL RESOURCES - EVEN ONE'S THE USER DOES NOT HAVE ACCESS TO
  • 29880431 FP BUG 29594319 - BAD ACTIVITY CODES GETTING COPIED WHILE COPYING MULTIPLE PROJECTS AT A TIME
  • 29823363 UNABLE TO UPDATE UNIT % COMPLETE MANUALLY
  • 29794863 IMPORT MICROSOFT PROJECT XML FILE CAUSES DATA TO BE GARBLED
  • 29593867 VISUALIZER OPTIONS BUTTON IS NOT WORKING ON THE FRENCH VERSION
  • 29410229 JOB STATUS NOT BEING UPDATED AFTER COMPLETION-SHOWS AS RUNNING
  • 29719968 18.8 STANDALONE MIGRATION TOOL DOESN'T WORK WITH SQL SERVER
  • 29702675 XML CAN'T BE IMPORTED TO SQLITE OR SQL SERVER