Oracle Primavera P6 Patch 16.2.8 Released

The following issues were resolved for Primavera P6 16.2.8. For more information visit Oracle Support.


P6 WEB

  • 26256757 - Resource analysis/resource team shows no values when grouped by project code

  • 26221730 - My preferences, view tab: an error occurred while processing your request

  • 26181766 - Invalid parameters requested when running sample P6 reports

  • 26150992 - Not able to select 0 as target with check schedule parameters in P6 web

  • 26144337- Time periods page mostly blanks when unchecking use assigned calendar...

  • 26143935 - Access denied when viewing log for service initiated by a different user

  • 26130917 - Actual units/costs for analysis role always displayed in spreadsheet

  • 26125852 - HTML assignments - save filter fails for resourceteam

  • 26114003 - Analysis page not loading all resource information in P6 web

  • 26093439 - Enterprise data html page udf indicators parameter value not in decimals

  • 26049974 - EPPM16.2.4: unable to save users list from ldap using copy preferences option

  • 26042949 - Resources / planning then assign resource using search

  • 26026171 - MSP import fails with msg field plannedfinishdate may not be set to null

  • 26020594 - Internal-fp: 25942230 - cost data is incorrect in xml import

  • 26020508 - Project deleted from the database when removed from risk matrix

  • 26008558 - EPS/project name replaced w/ ellipsis when text runs out of the picker box area

  • 26003521 - Setting ask me to select each time I assign doesn't work in standard view

  • 26000945 - Dynamic parameter p_P6_role_id uses role name instead of role id from P6 web

  • 25997101 - Adding project to export project scheduled service, exception has occurred!

  • 25995897 - Project list does not show correctly filtered projects when switching views

  • 25963441 - Standard view - predecessor and successor dialog box shows no activities

  • 25953585 - Link selected activities greyed out in standard view

  • 25946618 - Global calendars time periods 'between 1 and 8784' is cut off

  • 25942707 - Message 'generating report' does not disappear when running reports in P6 web

  • 25940516 - Codes with commas in name error invalid parameters request when run from P6

  • 25932329 - Copy from template in new EPS creates wrong project information

  • 25922489 - Error when same user switch to team usage view for the second time

  • 25918723 - P6 report displays incorrect labels for profile privileges

  • 25914847 - Reports are getting downloaded without file extensions

  • 25912491 - Approve timesheets not working problem populating upklist table

  • 25912230 - The team usage page does not load successfully

  • 25906901 - Unable to save change in activity % complete

  • 25889004 - Activities page hangs when succ/predecessor details columns added to globalview

  • 25888330 - Issues when entered a risk threshold-high value with commas like 9,999,999

  • 25853644 - Unable to load data when attempting to switch to basic view in the activities p

  • 25764865 - Unable to removed named resources from the resource planning page once saved

  • 25742903 - EPS group band UDF date fields blank out when switching views

  • 25722702 - Missing values in spreadsheet for resource analysis view

  • 25830611 - Internal P6 EPPM Java download links are downloading wrong version

INTG

  • 25812568 - API error array index out of bounds 16.2.3 API

  • 25810651 - Primary resource not imported for milestone activities

  • 25772273 - Set_refrdel_project_bypass not working with P6 web services

  • 25944061 - FP: gateway - P6 adapter does not allow write on activitystep for project

  • 25931606 - ORA-04091: table admuser.project is mutating, trigger/function may not see it

  • 25880864 - Gateway - P6 adapter does not allow write on activitystep for project

TM

  • 25826314 - Activity list in team member shows planned tasks

  • 25819050 - Updating tasks with activity % in team member does not update within P6

  • 26007050 - Status other resources not available until actual start is approved

  • 25773087 - Team member functionality with 508 compliance - jaws reader

  • 25945417 - Add error handling and remove password authenticator for for none email security

  • 25994085 - Error: actual finish date must have a resume date when doing status review

  • 25972786 - Chrome developer tool console shows 403 forbidden when accessing team member

  • 26001839 - Timesheet status does not match when edit resource's timesheet

SRVS

  • 26030031 - Apply actuals jobs completed with errors- unable to bring up the log file

  • 26172895 - Apply actuals jobs completed with errors due to -ve & +ve rsrc business rule

ADMIN

  • 25719267 - Users link in administrator page hangs/spins

P6PRO

  • 26237756 - Gantt chart bar disappears when collapsing and expanding the table rows

  • 26237736 - Optimize row height not including all text in the field using various fonts

  • 26237513 - Enabled filters become disabled when clicking select column header

  • 26237476 - UDF value cannot be imported from P6v7 to P6r15.1

  • 26088156 - Resource usage profile limit line drawn incorrectly under certain steps

  • 26076496 - P6 client - update baseline is not honoring the filter setting

  • 26076432 - Layouts belonging to unopened projects shows up in open layout dialog

  • 26043136 - Schedule comparison report is prefixing ⣠with ã‚, i.e. ã‚â£

  • 26030117 - Schedule options not retained when copying/pasting a project via job services

  • 26029352 - Resources added multiple times to activity not displayed after update baseline

  • 25997711 - Baseline field not set to <current project> after copying a project with no BL

  • 25992151 - FP: when copy/pasting a project, the order of the notebook topics gets reversed.

  • 25989541 - FP: create reflection doesn't create a project

  • 25980987 - The application and database version do not match message when lastusername null

  • 25980928 - Unique constraint (admuser.pk_udfvalue) violated when importing MS project file

  • 25922485 - Physical % complete entry is set to 0% after xml import into an EPPM database

  • 25883241 - P6 client - primary resource not imported for milestone activities

  • 25851959 - Clicking jobs in the job status window causes the text to disappear

  • 25808692 - Login issue: application and database versions do not match error

  • 25358614 - Costs report does not display summary or grand totals.

  • 25024446 - "Field" column is garbled in global change report

  • 24760339 - Layouts in japanese characters cannot be saved correctly

  • 23295920 - The filter does not work with the korean words correctly

  • 23086837 - Chinese condition value is garbled when saving filter

  • 22569877 - P6 Pro layout name shows chinese words as garbled characters