Oracle Primavera P6 Patch 16.2.7 Released
The latest patch for Primavera P6 is now available. Below are the issues that have been resolved with version 16.2.7.
WEB
25607708 |
P6 WEB RECALCULATES ASSIGNMENT COSTS RESULTS INCORRECT |
25897583 |
ERROR WITH UPDATE EXISTING XML IMPORT [OBJECT OBJECT] - THIS IS A REQUIRED FIELD |
25895582 |
UNDER RESOURCES TAB SEARCH FILTER IS NOT REMOVED |
25886473 |
PROJECT CODES - WEB |
25864136 |
NO ABILITY TO SELECT ALL FROM REPORTS IN P6 |
25841989 |
INTERNAL-FP:25797617:SERVER RETURNED HTTP RESPONSE CODE: 504 LOADING GLOBAL ACTI |
25835069 |
COPY/PASTE AND LETTER V ARE NOT ACCEPTED IN RISK CATEGORY |
25823565 |
ERROR "THE SELECTED DATES CREATE A GAP IN THE FINANCIAL PERIODS ... OCCURING |
25806788 |
DBENGINE ERROR WHEN ENTERED VALUE IS MORE THAN MAXIMUM VALUE FOR RISK THRESHOLD |
25802582 |
UNABLE TO IMPORT MSP XML WHEN NO TEMPLATES EXIST |
25773235 |
CANNOT ADD PROJECT IN STANDARD VIEW |
25756815 |
CHANGING ACTIVITY TYPE REMOVES ALL ACTIVITIES RELATIONSHIPS. |
25742903 |
EPS GROUP BAND UDF DATE FIELDS BLANK OUT WHEN SWITCHING |
25731219 |
USER ADMINISTRATION EXPORT CONTAINS TRAILING CHARACTER |
25716178 |
PXRPTUSER.PROJECT.SUMACTUALFINISHDATE HAS VALUE WHEN |
25713464 |
SET TIMESHEET MANAGER FOR RESEARCH FAILS WHEN THERE ARE MANY USERS |
25690059 |
CANNOT DISPLAY PREDECESSOR OR SUCCESSOR COLUMNS |
25661110 |
BASELINES NOT GETTING PUBLISHED TO WBSHIERARCHY TABLE |
25449050 |
NOTEBOOK DESCRIPTION DOES NOT SUPPORT MULTI BYTE CHARACTERS |
25359402 |
SUMMARY BAR SETTING IN STANDARD VIEW SETTING NOT WORKING PROPERLY. |
25204899 |
PLANNED DURATION FOR RESOURCES ARE DISPLAYING VALUES BEHIND THE DECIMAL |
INTG
25944061 |
FP: GATEWAY - P6 ADAPTER DOES NOT ALLOW WRITE ON "ACTIVITYSTEP FOR PROJECT |
25702513 |
UDFVALUE UPDATE MESSAGES ARE NOT BEING GENERATED |
SRVS
25581283 |
ROW LOCK `ENQ: TX - ROW LOCK CONTENTION' CAUSING PROJECT SUMMARIZATION SLOW |
25565842 |
PUBLISH RESOURCE MANAGEMENT SERVICE FAILS WITH ERROR ORA-06502 |
25834626 |
FP :UPDATEBASELINEOPTIONSERVICE OPERATIONS ERROR 'OBJECTID IS NOT A VALID FIELD' |
API
24968647 |
P6 API - ACTIVITY CREATE - INVALIDCLASSEXCEPTION: SERIALVERSIONUID MISMATCH |
TM
25823581 |
TEAM MEMBER, STEPS ARE NOT SHOWN IN THE ORDER THEY ARE ADDED IN THE CLIENT |
P6PRO
25290789 |
CVC-DATATYPE AND CVC-TYPE ERRORS STILL EXIST IN MSP XML EXPORT |
25549475 |
ACTIVITIES DELETED FROM BASELINES DURING UPDATE |
25797663 |
ERROR IMPORTING XLSX 'EST_WT COLUMN IS NULL' AFTER 16.2.5.0 UPGRADE |
25916866 |
VISUALIZER - PERFORMANCE DEGRADATION WHEN DRAWING A SECOND TSLD WITH LINES |
25911671 |
P6PRO CRASHES AFTER MOMENTARY NETWORK INTERRUPTION WITH CLOUDCONNECT |
25888855 |
ISSUE WHILE RUNNING MULTIPLE REPORTS SECOND TIME/REPLACE OLD FILES |
25888830 |
IMPORT XLS WILL DUPLICATE ROLE ASSIGNMENTS |
25888799 |
CHANGES PICKED UP WHEN MERGING REFLECTION TO SOURCE WHEN NOTHING |
25888603 |
SLOW DRAWING/SCROLLING OF PROJECT VIEW DUE TO DATABASE CALL FOR EACH ROW |
25866662 |
INTERNAL PLUGINS FAIL WHEN USER EXISTS IN OU WHERE # IS FIRST CHARACTER OF OU |
25862025 |
PROJECT ID CONTAINING FORWARD SLASH RESULTS IN XML EXPORT FAILURES |
25852742 |
LAYOUTS BELONGING TO UNOPENED PROJECTS SHOWS UP IN OPEN LAYOUT DIALOG |
25840073 |
INTERNAL-FP: 25091337: XML EXPORT FAILS WITH SEVERE: DBENGINE.EXECUTESELECT |
25823623 |
PHYSICAL % COMPLETE ENTRY IS SET TO 0% AFTER XML IMPORT INTO AN EPPM DATABASE |
25822661 |
XML EXPORT FAILS WITH SEVERE: DBENGINE.EXECUTESELECT |
25815291 |
COPYING A CHECKED OUT PROJECT LEAVES THE RESULTING PROJECT CHECKED OUT |
25808692 |
LOGIN ISSUE: APPLICATION AND DATABASE VERSIONS DO NOT MATCH ERROR |
25759157 |
PERFORMANCE: DELETING A WBS CAUSES MANY INEFFICIENT CLOUDCONNECT REQUESTS |
25700339 |
XML FILE CAN'T BE DOWNLOADED DUE TO '&' IN PROJECT NAME |
25670568 |
INTERMITTENT AVAA0 ERRORS WHEN CHANGING LAYOUTS |
25520960 |
ERROR ADDING EXTERNAL APPLICATION LINK TO TOOLS MENU FOR EPPM DATABASE |
25333413 |
AFTER UPGRADE FROM 15.2 TO 16.2 P6 PROFESSIONAL IS NOT WORKING THROUGH SAML |
- Last updated on .