Unifier Language Preferences

How To Set Your Language Preferences In Unifier 10.1

Unifier 10.1 has given each user the ability to customize their user experience based on their region. Users are able to select which language, time zone, date format, and number/currency formats they wish to work with. There are currently 11 different languages available for a user to choose from.

Withholding the Current Period from P6-Reporter with an Integrated P6

Preventing Current Period Actuals from Bleeding into the Previous Period

Many of our clients use Primavera P6 as one part of an integrated solution involving other systems. One common scenario is to bring labour actuals from a timesheet system or cost actuals from an accounting system into P6. This allows the projects team to see all of the project data in the tool they are familiar with and orients them around a project-major axis.

Integrating Accounting Systems With Primavera P6

A nightly cost and labor integration from a cloud hosted accounting system and P6

For one of our modular manufacturing clients, we built a nightly cost and labor integration from their cloud hosted accounting system into Primavera P6 EPPM. The integration loads actual hours and actual costs onto the P6 resource assignments from all internal office and shop team members’ timesheets. It also integrates Purchase Order line item costs onto the P6 expenses for externally procured services and materials, as well as internal product costs from bulk purchased inventory transfers.

Developing a Piping Tie-In Schedule from Excel Estimates Using the P6-Loader

How A 'P6 Level 4 Schedule Reloader' Was Born

When working with a client who engaged Emerald to assist with developing a detailed schedule for piping tie-ins on a major SAGD oil sands expansion project, we found that the old way of building field installation work package( FIWP) templates or fragnets (for those P3 users) and copying them in P6 was just not effective. We had built resource loaded templates in P6 and started replicating them by hand by ISO and FIWP. We had to develop the typical sequences, overlay the manpower loading, and coordinate for limited camp space through resource loading as well as handle shop limitations and deliveries from Ontario and the US.

EPPM 8.4 Multiple Selection Bug

A quirk when selecting values in the report filter drop down menu

Oracle has introduced a new feature to EPPM 8.4 that allows “multiple selection” on report filters. This is a great feature that adds a new dimension to the filters that can be created on reports. At Emerald Associates, we have already used the “multiple selection” capability on BI Publisher reports that we developed for clients recently.

One of the quirks we discovered when testing the multiple selection feature is that the user that runs the EPPM report has to be careful about how they select the values in the report filter drop down.

Financial Period Reporting using Primavera P6 and P6-Reporter

Accommodating the March of Time

Financial Period Reporting using Primavera P6 and P6-Reporter

As any project manager or scheduler will tell you, Primavera P6 is a great tool for project planning and execution. P6 is designed to allow you to manage cost, schedule, and resource information in as much detail as you want. It allows you to know where you are on a project and what is coming up, potential issues, what absolutely must be done on time to prevent project delivery from being delayed, and so on. This is all tactical information and P6 has an outstanding feature set to help manage it.

The same information in P6 that has such tactical value can also have huge strategic value. The detailed schedule documents, not only when certain work will be done, but when specific resources such as labour, equipment, materials, and money will be required. Summarizing this time-distributed resource information to the project level or higher provides a big picture view of the project's projected resource and spend profiles over time.

Populating A P6 Activity Code Dictionary On The Fly

The P6-Loader In Action

Emerald has been doing a lot of work lately in the Turnaround space helping large oil companies efficiently plan and execute their Turnaround projects. Increasing productivity and efficiency has always been important for oil producers, but now more than ever we are seeing a higher demand due to the current market conditions. This is when Emerald’s Primavera add-on tools come into play. Emerald’s tools become truly indispensable when time, cost savings and the optimization of work processes are high priorities.

What’s Wrong With Using The Primavera SDK To Load Data Into P6?

The benefits of integrating Primavera P6’s database with Microsoft Excel have long been a secret weapon of many advanced Primavera users. By leveraging spreadsheet functionality to manipulate project and enterprise level P6 data and avoid time consuming manual data entry, users are able to drastically increase their productivity and leave envious colleagues in awe of their P6 wizardry.

The Primavera Software Development Kit (SDK) is a legacy technology feature that is included with Primavera P6. It was released with P6 r3.0 (at the time known as P3e). It implements an ODBC driver that enables a connection between the Primavera P6 data store and other software such as Excel or Access. However, as the underlying P6 technology has advanced significantly in recent years, many are finding the old SDK tricks falling short in today’s Primavera enterprise environments. Some serious technical drawbacks of the antiquated SDK have made it a non-option for many Primavera client companies.

When Oil Prices Go Below 50$/Barrel - How Do You Re-Arrange Your Capital Program Quickly In P6

P6-Loader to the Rescue

In January when the oil prices fell below 50$ a barrel, many of our Calgary clients started re-evaluating their capital project plans to get the most out of this year’s investments. One of our clients was planning to invest in significant pipeline infrastructure and progress on a drilling program with 6 drill rigs on the go at any given time. The client needed to rearrange priorities and reduce this year’s plan down to 3 rigs and decrease main trunk line development.

Should I Install P6 PPM or P6 EPPM When Installing Primavera P6 on a Single Workstation?

Some technical considerations to help you decide which Primavera P6 version is right for you

This is a very common and puzzling question for someone who is installing P6 on a single workstation and is only going to have a single user – should I go with P6 Professional, also known as Primavera Project Portfolio Management (PPM), or P6 Enterprise, also known as Enterprise Project Portfolio Management (EPPM)?

We Caught Another Primavera P6 Bug

Bug 17904646 : DATA NOT REFRESHING FOR MULTIPLE USERS AFTER CHANGES COMMITTED TO DATABASE

One of our consultants who is currently loading large amounts of P6 data using Emerald’s P6 Loader came to me with a concern that there is sometimes a lag between loading information using our P6 Loader (via the API’s) and it appearing in P6, even if he repeatedly pressed the F5 (Refresh) key. The lag could be minutes or hours depending on the situation.

Managing Group Memberships in Unifier

Simplifying Bulk Access Control Administration

Primavera Unifier has a powerful security model that can be challenging to administer. It allows modeling roles by using groups and assigns roles to users by adding them to those groups. In addition, permissions can be granted to groups. The thing that makes it difficult to administer is that each project and shell has its own groups.

What's New in Primavera Unifier 10.1

Primavera Unifier Goes International with Multi-Language

The release of version 10.1 marks a new milestone in the progression of Primavera Unifier as an international product. It’s a tough choice between whether the introduction of multi-language capabilities or the significant changes in the P6 Integration functionality is our favorite improvement.